UNICANN public operating standard

What UNICANN verification statuses mean.

This standard defines how UNICANN describes the recorded state of information for a limited conversion screen: what a source supports, who reviewed it, what scope it covers, and how long that posture remains current.

Version
1.0
Status
Public product and operating standard
Reviewed
September 27, 2026
Cadence
At least annually and after material rule changes

Screening record, not assurance

Statuses describe the recorded evidence posture for a limited scope and time. They do not establish utility availability, engineering feasibility, regulatory approval, transaction terms, financial outcome, or suitability for a particular purpose.

Canonical vocabulary

Six terms, each bounded by object, scope, and time.

The first four terms apply to individual claims. The final two apply to permissioned packages. They are layered controls, not a universal ladder and not a composite feasibility score.

01

Claim or factor

Recorded

An assertion has a stable record, accountable origin, recorded time, and defined scope.

Boundary

It does not establish that the assertion is true, complete, sourced, reviewed, current, or usable.

02

Claim

Documented

A retained evidence item or durable source reference is linked, identifiable, legible enough for scoped review, and has no known integrity failure.

Boundary

It does not establish that the review is complete, the source is sufficient, the claim is current, or its contents support a broader conclusion.

03

Claim

Independently Reviewed

A reviewer who is separate from the source and the claim author examined current evidence against a recorded question and documented the scope, result, limits, and conflict posture.

Boundary

It is not an audit, endorsement, technical sign-off, guarantee, or site-wide conclusion. A reviewed result can still be partial, adverse, or conflicting.

04

Narrow utility claim

Utility-Confirmed

A current written response or verified record attributable to the applicable utility confirms the exact stated parameter, boundary, use, date, and conditions; an independent review records only that scope.

Boundary

It does not by itself establish reserved or deliverable load, interconnection approval, tariff outcome, construction timing, redundancy, or a service commitment.

05

Permissioned review package

Buyer-Ready

A current, mandate-specific package meets the controlled criteria for sharing with an identified buyer review group.

Boundary

It means ready for a bounded diligence conversation—not approved, deployable, valued, exclusive, financeable, or ready to transact.

06

Frozen report package

Report-Ready

The current record can produce a complete, reproducible frozen screening report with sources, versions, assumptions, unknowns, conflicts, limitations, and release control.

Boundary

It does not turn a screening record into a decision, recommendation, reliance opinion, design basis, or assurance.

Claim evaluation

The record shows the question before the conclusion.

A source is never allowed to support more than it actually covers. Each review preserves provenance, scope, time, limitations, and adverse results.

  1. 01

    Record the bounded assertion

    Identify the claim, origin, actor, recorded time, scope, units, and current revision. Missing facts stay unknown.

  2. 02

    Link source and evidence

    Retain the protected item or durable reference with attribution, observed date, relationship to the claim, integrity information, and access controls.

  3. 03

    Record the review outcome

    Answer the review question for the stated scope and date. Record what was and was not found, reviewer separation, conflicts, limitations, and freshness.

Reviewed does not always mean supportive

A negative, partial, insufficient, stale, or conflicting result is a valid review outcome. It remains visible and cannot be hidden to preserve a favorable package status.

Unknown

A required fact has not been established. It remains unknown and contributes no positive inference.

Partial

Evidence supports only part of the recorded scope or leaves a material qualifier unresolved.

Conflicting

Current sources materially disagree. The favorable source is not selected by default.

Stale

The freshness deadline has passed. The item cannot support a current status until refreshed and reviewed.

Withdrawn

The item remains in history but is excluded from the current supporting basis.

Utility claims need special care

Only the exact parameter and conditions may be repeated.

Utility-Confirmed requires a current, attributable utility record for the same location boundary and intended-use scope, plus an independent review. The default maximum freshness window is 60 days, or shorter when the source says so.

Controlled wording

“Utility-Confirmed for the stated parameter and date only; not a capacity reservation, interconnection approval, or guarantee of service.”

Unsupported wording

“Power available,” “utility-ready,” or any statement derived only from a prior bill, service band, map context, or arithmetic.

Freshness & currentness

Current is a computed condition—not a permanent label.

A current claim has not passed its freshness deadline; has not been superseded, withdrawn, or hard-expired; and is not in unresolved material conflict. All timestamps are evaluated as UTC instants. Current does not mean true for every purpose.

Upload authorization

A short window for completing a pending upload. It says nothing about the age or quality of the content.

Access grant

The period in which a named recipient may access a protected record. Access and evidentiary currentness are separate.

Claim freshness

The deadline after which a claim must be refreshed before it may support a gate, match, or package status.

Hard expiry

The absolute end of a time-bounded response, authorization, study, or release. It cannot be extended by a later review alone.

Default maximum freshness windows

The shortest of the source term, release term, reviewer-set date, or the default below controls. A hard expiry always wins.

Claim or factor familyMaximum window
Utility service, post-shutdown capacity, tariff, delivery or interconnection60 days
Control, option, consent, lease or title summary90 days
Active operating transition30 days
Completed transition record90 days
Electrical, building, cooling, life safety or active site condition180 days
Network path or carrier context90 days
Permit, zoning, authority path or schedule60 days
Regional infrastructure factor180 days; 60 for active hazard or restriction
Buyer mandate, deterministic match, or buyer-linked report30 days maximum

At the freshness deadline, the affected claim becomes stale, dependent evaluations run again, and the current status is suppressed. A material source change triggers the same reevaluation immediately; there is no grace period for a known material change.

Passport gates

G0–G7 organize the next question.

Each gate describes whether the recorded evidence supports a defined next review step. The gate system has no composite feasibility score, and its labels must not say passed, approved, or ready.

G0

For next step

Control and review authority

Current control evidence supports the next review step. It does not establish marketable title, transfer consent, or transaction authority.

G1

For next step

Operating transition

Records a scoped cessation or transition posture. It does not establish completed decommissioning or regulatory closure.

G2

For next step

Utility and service power

Requires at least one current Utility-Confirmed claim for Buyer-Ready status. A reviewed service record alone does not create that status.

G3

For next step

Building reuse

Records a scoped physical-information posture. It does not establish structural, code, or reuse fitness.

G4

For next step

Cooling basis

Records review of the stated cooling basis. It does not establish performance, water, efficiency, or design adequacy.

G5

For next step

Network path

Records carrier and path context. It does not establish diversity, serviceability, latency, or delivery commitment unless expressly scoped.

G6

For next step

Life safety

Records the current review posture. It does not establish code compliance or authority approval.

G7

For next step

Approvals and schedule

Records the documented path and unknowns. It does not establish entitlement, permit outcome, schedule, or a legal conclusion.

Package posture

Buyer-Ready

Controlled review of the recorded mandate only. The package must have a current release, a stable record version, acceptable G0–G7 states, no open material blocker, current, independently reviewed mandatory claims, the required utility claim, a current mandate and deterministic match, separate package approval, and an exact recipient scope.

Not a transaction outcome, exclusivity signal, deployment finding, valuation, or approval.

Frozen record posture

Report-Ready

A frozen report must preserve the record version, evidence register, gates, blockers, conflicts, assumptions, unknowns, methodology and rule versions, canonical hash, author and separate approver, current-through time, release classification, and changes from any prior report.

A report can be frozen while still unready. New evidence produces a superseding report; the original snapshot is never edited.

A release authorizes specified metadata or a report for a named audience, purpose, and period. It does not automatically grant document access. Protected evidence requires a separate record-level grant that can expire or be revoked; all access under it is logged.

Map & privacy boundary

Regional context must not become an exact-location inference.

Map factors are sourced, coarse contextual assertions. Their impact classification does not establish site-level access, distance, capacity, route, serviceability, water, permitting, or risk.

Illustrative precision boundary

Text alternative: an abstract regional grid shows a wide uncertainty area rather than a point, parcel, route, utility asset, or address.

Never exposed by the public map

  • Exact address, parcel, or coordinate
  • Utility account, service point, circuit, or route
  • Carrier path, measured distance, or capacity
  • Protected document contents or contact details
  • A claim of availability based on marker placement

Evidence is encrypted, non-public, controlled by record-level grants, and subject to expiry and revocation; all access is logged. A grant addresses access only; it is not a conclusion about the evidence.

Conflicts, corrections & appeals

Correct the present without erasing the past.

Materially affected parties and authorized sources may challenge released wording or status. The process preserves the original record, protects confidential material, and adds a new revision or disposition rather than silently overwriting history.

Suspend

When used
Staleness, new material data, an unresolved conflict, a pending correction or appeal, release expiry, or pending re-review.
Effect
Hide the current status while retaining a potentially curable, auditable history.

Revoke

When used
Evidence is materially false, unauthorized, altered, misattributed, improperly disclosed, or withdrawn without replacement, or the status criteria were not met.
Effect
End that issuance permanently. Any later status requires a new evaluation.

Supersede

When used
A newer revision or report replaces an older one without a finding of wrongdoing.
Effect
Preserve the older item as history and exclude it from current support.

Expire

When used
A fixed deadline or hard expiry is reached.
Effect
End current eligibility automatically; historical metadata remains.

Non-public correction path

Challenge the exact record, not the public narrative.

Use the correction control attached to the released status or report. A request identifies the record, challenged wording, claimed scope error, a contact channel, and an optional protected evidence-reference route. Confidential evidence is never required to be submitted through a public upload.

  1. 1

    Acknowledge

    Issue a receipt; the request is not an admission or a review result.

  2. 2

    Triage

    Check authority, materiality, privacy, and whether immediate suspension is required.

  3. 3

    Preserve

    Freeze history and references; do not delete the challenged original.

  4. 4

    Review

    Where practical, use a reviewer who was not responsible for the challenged entry.

  5. 5

    Determine

    Add a correction, scope clarification, conflict case, suspension, revocation, or reasoned no-change result.

  6. 6

    Notify

    Where contact details and authority permit, provide the determination and the available appeal route.

Operating targets, not guarantees

Target acknowledgement within five business days and a status update within fifteen business days, subject to access, source availability, safety, preservation, and scope.

Administrative appeal

An authorized requester may appeal within 30 calendar days of notice, or later with material new information. Where practical, a different reviewer assesses the appeal; any unresolved material status remains suspended.

Controlled claim boundary

What UNICANN statuses do not claim.

A status can describe only the recorded evidence posture for its stated object, scope, source, and time. It cannot be used as marketing shorthand for a broader outcome.

Status is not a site verdict

  • Do not turn any status into claims such as “certified,” “accredited,” “approved,” “AI-ready,” “data-center ready,” “bankable,” “investable,” or “due-diligence complete.”
  • Do not describe a gate, match, confidence label, or report status as a feasibility finding, recommendation, valuation, offer, or closing probability.

Power language stays exact

  • Do not infer usable load, availability, delivery, or compatibility from an amp/voltage calculation, service band, prior bill, map factor, or match result.
  • Do not imply a utility commitment for capacity, interconnection, tariff, construction, service date, or redundancy beyond the exact written source and its conditions.

Privacy and release are separate

  • Do not infer a parcel, service point, route, distance, capacity, account, or exact infrastructure location from coarse map context.
  • Do not imply that a recipient can access protected evidence or contact a counterparty without the specific release and record-level grant.

Independence must be recorded before independent-review language is used. A frozen report is historical after its current-through date or a material source change.

Read all disclosures

Governance & release history

Rules change by version, never by silent reinterpretation.

Material changes receive a dated entry, a new criteria version, a compatibility review, updated tests, and reevaluation or explicit historical labeling for affected records.

Current document

Verification Standard 1.0

Release state
Proposed
Criteria family
verification / 1.0
Published
September 27, 2026
Archive
No earlier public version

Establishes the six canonical status definitions; claim, evidence, review, and independence controls; currentness and expiry behavior; G0–G7 interpretation; utility-specific limits; package criteria; map privacy; corrections and appeals; release separation; prohibited language; and immutable report supersession.

Global caveat

Screening record, not assurance. Statuses describe the recorded evidence posture for a limited scope and time. They do not establish utility availability, engineering feasibility, regulatory approval, transaction terms, financial outcome, or suitability for a particular purpose.